
The Following Are Some of our Completed Projects:
Intex Fontana Commerce Center (Phase I & II) Fontana, California Two (2) single story tilt-up warehouses Phase I: 330,000 s.f. / Phase II: 401,000 s.f. ESFR fire sprinkler systems.

Fluidmaster • San Juan Capistrano, California 175,000 s.f. office and manufacturing facility and 25,000 s.f. support and recreation building.

Hershey /Redlands • Redlands, California 590,000 s.f. tilt-up distribution center

Port of Los Angeles (Phase I) • San Pedro, California Two (2) spec. industrial buildings Building C: 340,000 s.f. Building D: 207,000 s.f.

Port of Los Angeles (Phase II) • San Pedro, California Two (2) spec. industrial buildings Bldg. (A) 760,000 s.f. • Building (B) 497,000 s.f.

Commerce Way Distribution Center • Fontana, California 818,000 s.f. build-to-suit distribution/warehouse facility for the Home Shopping Network

Footstar (Phase I) • Mira Loma, California 350,000 s.f. tilt-up distribution facility with 20,000 s.f. two-story office area.

Footstar (Phase II) • Mira Loma, California167,000 s.f. addition to existing warehouse, new 60,000 s.f. two-story parking structure with 30,000 s.f. of office space
|